Unit E5 Eastway Business Park
Limerick, Ireland
V94 DW30
Sat/Sun Closed
Mon - Fri 8.00 - 17.00
Client
Project Duration
St Vincent's School Lisnagry
7 Months
Project Description
St. Vincent's Special School Refurbishment
Work Included
-
This involved phasing the project to accommodate the Live operation of the school, with vulnerable occupants and disabled children that needed planning and coordination of all aspects of the project.
-
Works involved a new build to sections of the site, with the complete electrical rewire, fire alarms, roof covering, external accessibility enhancements, fire safety upgrades, Asbestos removal, boiler upgrade a
-
Old windows and frames were removed throughout the building and replaced to increase energy efficiency and cut down on heating costs. These along with the installation of a new, energy-efficient gas boiler system will allow the school to operate at a reduced heating cost working towards Nzeb.
-
A new intercom system along with an access control system was incorporated into the works to allow for safety and accessibility throughout the building. Ramps were built externally to allow access and exit from existing and new doorways, these along with new handrails allow for safe entry and exit no matter the user. The building was received new finished throughout, ceilings, walls, painting floor covering, fire doors, etc.
-
These improvements were made to ensure a safe, accessible, and comfortable learning environment for students and staff while ensuring the safety of both students and staff alike during the demolition and construction process.
![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |